A quality system you can hand to a prime.
Our quality program is built to survive a prime contractor audit and a DCMA spot check. No surprises in the FAIR. No gaps in the CoC.
Aerospace QMS with risk-based thinking, configuration management, counterfeit-part prevention, and FOD control woven through every operation.
Full First Article Inspection on every new part number — Forms 1, 2, and 3 — with bubble-numbered drawings, characteristic accountability, and measured results.
Heat-lot to operation to inspection record. Every raw bar, every fastener, every coat: traceable end-to-end. Material certs and CoC delivered with shipment.
CMM, optical comparator, surface profilometer, and calibrated hand-tool inventory. Gauge R&R and MSA documented. Calibration records under ISO/IEC 17025-equivalent control.
FPI, MPI, hardness, and PMI through audited Nadcap-aligned partners. Coordinated through Mohave Forge as sub-jobs with traceable records.
Documents delivered with every shipment
- ▸Certificate of Conformance (CoC)
- ▸Material certifications (mill, heat lot)
- ▸AS9102 First Article Inspection Report
- ▸In-process and final inspection records
- ▸Special-process Nadcap certificates
- ▸Packing slip with traceability index