A vertically integrated defense manufacturing stack.
From DFM and prototyping through validated serial production and compliance documentation — orchestrated by the Forge OS.
Simultaneous 5-axis machining of complex aerospace geometry. Titanium (Ti-6Al-4V, Ti-CP), Inconel 625/718, hardened tool steels, aluminum 7075/AL-Li.
- TOLERANCE
- ±0.0002"
- ENVELOPE
- 30 × 24 × 22"
- SPINDLE
- 20K RPM · HSK63
- MACHINES
- DMG-MORI · HAAS · MAZAK
Swiss-type and multi-axis mill-turn cells for high-aspect-ratio, high-tolerance rotational components.
- BAR DIA
- 0.04" – 4.0"
- LENGTH
- UP TO 36"
- LIVE TOOLING
- Y-AXIS + C-AXIS
- MACHINES
- DOOSAN · TSUGAMI
Metal DMLS / SLM, plastic SLA, MJF, and FDM. From CAD to functional prototype within 72 hours for qualifying programs.
- DMLS MATL
- INCONEL · TI · 17-4 PH
- LEAD TIME
- 72H STANDARD
- LAYER RES
- 20 µm
- BUILD VOL
- 250 × 250 × 325 mm
Validated, repeatable serial production. PPAP, FAIR, and SPC integrated into the Forge OS. Lot sizes from 100 to 100,000.
- LOT SIZE
- 100 – 100K
- CAPACITY
- 24 / 7 LIGHTS-OUT
- YIELD
- 99.4% AVG
- TRACKING
- FORGE OS · MISSION
Design for manufacturability, tolerance stack analysis, fixture and tooling design, process engineering, and program management.
- DFM REVIEW
- INCLUDED
- TOL ANALYSIS
- GD&T · ASME Y14.5
- CAD
- SOLIDWORKS · NX · CATIA
- CAM
- MASTERCAM · HYPERMILL
AS9100, CMMC L2, ITAR registered. CMM, laser scanning, surface profilometry, and full traceability with material certs and FAI per AS9102.
- CMM
- ZEISS · 0.5 µm
- FAI
- AS9102 REV C
- CERTS
- AS9100 · CMMC · ITAR
- TRACE
- HEAT-LOT TO PART
Mechanical and electromechanical sub-assembly, kitting, torque-controlled fastening, and packaged delivery.
- CLEAN ROOM
- ISO CLASS 8
- TORQUE
- CALIBRATED · LOGGED
- KITTING
- BARCODED
- PACK
- MIL-STD-2073
When processes are out-of-house — anodize, plating, heat treat, EDM, NDT — the Forge routes work to vetted vendors with full chain-of-custody.
- NETWORK
- 40+ VETTED
- PROCESS
- ANODIZE · PLATE · HT
- NDT
- FPI · UT · RT
- TRACE
- END-TO-END
Dedicated program managers, mission-based tracking, milestone reporting, and executive briefings for every program.
- PM RATIO
- 1 : 4 PROGRAMS
- REPORTING
- WEEKLY · IPMR
- TOOLS
- FORGE OS
- ESCALATION
- <2H